FAQ
How much time should pass between applying cement and lime plaster and gypsum finishing coat?
The shortest technological break is three weeks. After that time, works with the use of gypsum finishing coat can be commenced. In case of tight timing, we recommend using AT 307 lime finishing coat. This product can be applied after the surface of the plaster has dried, i.e. after 7 days (in favourable conditions, temperature: 20°C, humidity: 60%). |
||